Preparation of Moroto District Physical Development Plans Consultancy Services for Feasibility Study and Detailed Engineering Design for Upgrading of Selected National roads (8 lots): Lot 3: Hamurwa – Kerere – Kanungu (47 km), Kanyantorogo – Butogota – Buhoma (32 km) and Butogota – Hamayanja – Ishasha – Ikumba (64 km) Feasibility and ESIA studies for small hydropower projects: Okulacere 6.5MW, Agbinika 2MW and Maziba 1MW in association with TRACTEBEL ENGINEERING S.A. Detailed Engineering Design and ESIA of Unyama, Namalu and Sipi Irrigation Schemes. Feasibility Study of Expansion of Uganda Railways Passenger Services in Greater Kampala Metropolitan Area: Environmental Scoping study for the railway lines of Kampala-Mukono and Kampala-Bujjuko station Stakeholders. Euronet Consulting Eeig 73 Rue Potager B 1020 Brussels, Belgium Environmental and Social Impact Assessment (ESIA) for the Uganda Wildlife Research Institute (UWRTI) Katwe Kabatoro and Uganda Wildlife Education Centre (UWEC) Entebbe funded by the World Bank Environmental Social Impact Statement for Feasibility Study, Detailed Engineering Design, Tender Assistance for Gulu Solid Waste Management Facility for Integrated Program to Improve the Living Conditions in Gulu – Development of Social and Technical Infrastructure for the Urban Poor with Focus on Water and Sanitation