-2017: Project Title: Preparation of Detailed Physical Plans for selected areas in Hoima Municipality
Client: Hoima Municipal Council
Location: Hoima, Uganda

-2017: Project Title: Kampala Lake Victoria WATSAN project package 5. Detailed design, tendering and construction supervision of water and sanitation improvement infrastructure in the informal settlements in Kampala with Fichtner and M&E Associates (Environmental Component
Client: National Water and Sewerage Corporation
Location: Kampala, Uganda

-2017: Project Title: Preparation of Detailed Physical Plans for selected areas in Hoima Municipality
Client: Hoima Municipal Council
Location: Hoima, Uganda

-2017: Project Title: Environment and Social Impact Assessment of the proposed Kampala-Kasese- Kigali standard gauge Railway line with Gauff JBG
Client: Uganda Railways Corporation
Location: Uganda and Rwanda

-2016: Project Title: Preparation of Physical Development and Detailed Plans for 8 Trading Centers in the District of Hoima and Bulisa. LOT 1 (Kigorobya, Wasenko and Biiso)
Client: Ministry of Lands, Housing and Urban Development, Kampala
Location: Hoima and Buliisa

-2016: Project Title: The role of the informal economy in city growth in the context of Uganda Research monograph; Transformational Change in Sub-Saharan Cities: For Future Cities Africa – Cities Alliance project
Client: The Max Lock Centre, University of Westminster, UK in a Consortium with the University of Greenwich, Natural Resources Institute
Location: Mbale, Jinja, Mbarara and Gulu

-2015: Project Title: EIA For the Proposed Kiira Motors Development Site in Kagogwa-Butembe, Jinja Business and Industrial Park
Client: Kiira Motors/Makerere University
Location: Jinja, Uganda

-2015: Project Title: Environmental Social Impact Statement for Feasibility Study, Detailed Engineering Design, Tender Assistance & Project Management for Upgrading Roads to Bituminous Standards in Lot C Road Project Addendum No. 1.Nsangi-Kasanje-Maya-Nakawuka-Kisubi
Client: Uganda National Roads Authority
Location: Entebbe, Mpigi, Kampala

-2015: Project Title: Preparation of Selected Detailed Physical Plans for Fort Portal Municipality
Client: Fort Portal Municipal Council
Location: Fort Portal, Uganda

-2015: Project Title: Site Selection of New Towns for the Greater Kampala Metropolitan Area (GKMA)- Korea National Housing Corporation; Sub Consultants
Client: Ministry of Lands, Housing and Urban Development, Kampala
Location: Kampala, Uganda

-2015: Project Title: Environment Social Impact Assessment for Feasibility Study, Detailed Engineering Design and Tendering Documentation for Water Supply and Sanitation Systems for Namasale, Loro and Nakasongola RGC (Environment Component) with M&E Associates
Client: Ministry of Water and Environment
Location: Oyam, Amolatar, Uganda

-2015: Project Title: Environment Social Impact Assessment for: Feasibility Study, Detailed Engineering Design and Tendering Documentation for Nyamugasani Water Supply and Sanitation Systems with ACES Engineering Consultants
Client:
Location: Uganda

-2015: Project Title: Environmental and Social Safeguards supervision of Moroto-Nakapiripirit road to Bitumen Standard with Prome Consultants
Client:
Location: Uganda

-2014: Project Title: Pre-Design for the integrated Programme to Improve the Living Conditions in Gulu Municipality (IPIL) (Physical Planning and Environment Component) with Fitchner and M&E Associates
Client: Ministry of Water and Environment
Location: Uganda

-2014: Project Title: Environment Social Impact Assessment for Feasibility Study and Detailed Design of Water Supply Systems for Selected Towns Lot 1: Bukwo, Namwiwa, Bulegeni, Lumino, Kibale and Idudi with ACES Engineering Consultants
Client: Ministry of Water and Environment-Water and Sanitation Development Facility-East.
Location: Uganda

-2014: Project Title: Environment Social Impact Assessment for Feasibility and detailed Design for Mayuge, Kayabwe, Buwama, Nkozi, Ntugamo, Bukakata and Lambu water and sanitation works under the L.Victoria Water and Sanitation Project
Client: Ministry of Water and Environment
Location: Mayuge, Masaka,Mpigi

-2014: Project Title: Environmental Social Impact Assessment for SKA Proposed petroleum products terminal in Kkoolo-Buwanyi area, Mukono
Client: SKA
Location: Mukono-Uganda

-2014: Project Title: Preparation of a Physical Development Plan for Hoima Municipality (Albertine Graben Region), Uganda)
Client: Hoima Municipal Council
Location: Hoima Municipality, Uganda

-2014: Project Title: Preparation of Physical Development Plans for Selected three Towns in the Albertine Graben, Uganda (Buliisa, Sebigoro and Butiaba
Client: Ministry of Lands, Housing and Urban Development, Kampala
Location: Hoima and Bullisa, Uganda

-2014: Project Title: Consultancy services for preparation of detailed design for infrastructural development of 14 selected Municipalities (Uganda Sustainable Municipal Infrastructure Development Project-USMID). Environment, Physical Planning and Resettlement Action Plan Component with Prome Consultants
Client: Ministry of Lands, Housing and Urban Development, Kampala
Location: Uganda

-2014: Project Title: Environmental and Social Impact Assessment for Steel and Tube to be constructed in Namanve industrial park, Mukono municipality
Client: Steel and Tube Industries
Location: Mukono-Uganda

-2014: Project Title: Review of Power line designs (Lot 1, 3 and 8) Environmental Component with Multi-Konsult
Client: Rural Electrification Agency
Location: Uganda

-2014: Project Title: Environmental and Social Impact Assessment for Kampala fertility hospital (IVF) to be constructed in Kitante
Client: Kampala fertility hospital (IVF)
Location: Kampala,Uganda

-2013: Preparation of Physical Development Plans for Selected three Towns in the Albertine Graben, Uganda (Bulisa, Sebigoro and Butiaba (October 2013-On going)

-2013: Environmental Impact Assessment for Kalangala Rural Electrification and Submarine power Cable Project.
Lot 6: Kanungu Service Territory and Mbarara Service Territory: Lwengo, Rakai, Kiruhura, Ntungamo Mbarara, Kabale, Lyantonde, Sheema, Buhweju, Isingiro Sembabule and Masaka Districts.
Lot 5: Mid-Western Service Territory (II) including Bundibugyo Territory: Ntoroko, Kibaale, Hoima, Masindi and Kiryandongo Districts areas.
Lot 3: Lira Service Territory including Gulu Territory: Lira, Dokolo, Soroti, Kaberemaido, Amuria, Alebtong, Kole, Otuke and Agago district areas.
Lot 2: North Eastern Service Territory including East Nile Territory: Kamuli, Namutumba, Busia, Bududa, Soroti, Amuria, Pallisa, Ngora and Serere district areas Electricity distribution lines with Mult-konsults Ltd: Ministry of Energy and Mineral Development/Rural Electrification Agency (March-September 2013)

-2013: Consultancy services for preparation of detailed design for infrastructural development of 14 selected Municipalities in Uganda (USMID) with PROME Consultants: Under the Word Bank (November 2012- October 2013)

-2013: Environment and Social Impact Assessment for : Feasibility study, detailed engineering design, tender assistance and project management for upgrading roads to bituminous standards – lot A Addendum (Atiak -Kitgum (108 kms), Pajule-Pader (18kms), Masindi Port and Karuma Nile Bridges AIC Italy in association with Prome Consultants Ltd. (May 2013-Ongoing)

-2013: Environment and Social Impact Assessment for : Feasibility study, detailed engineering design, tender assistance and project management for upgrading roads to bituminous standards – lot C Addendum(Kisubi-Nakawuka-Nateete, Nakawuka-Kasanje-Mpigi, Nakawuka-Mawungulu-Nanziga-Maya, Kasanje-Buwaya, Entebbe-Nakiwodo/Kiwafu), Sheladia Assocaites of USA in association with Prome Consultants Ltd. (October 2013-Ongoing)

-2013: Environment and Social Impact Assessment for: Feasibility Study, Detailed Engineering Design and Tendering Documentation for Water Supply and Sanitation Systems for Lirima Gravity Water Suuply Scheme: Directorate of Water Development September, 2013.

-2013: Environment and Social Impact Assessment for: Feasibility Study, Detailed Engineering Design and Tendering Documentation for Water Supply and Sanitation Systems for Barr RGC, Lira District, with Warner Consultants Ltd, Uganda: Directorate of Water Development (Water and Sanitation Development Facility – North (WSDF-N), September 2013.

-2013: Environment and Social Impact Assessment for Pader Cotton Seed Processing Plant with Plan Systems Ltd: Cotton Development Organisation: (January-May 2013)

-2013: Environment and Social Impact Assessment for Namanve Inland Container Depot: Bro Group Ltd: (March-May 2013)

-2013: Environment and Social Impact Assessment for Logistics Support Camp for oil drilling activities in Packwach: Bro Group Ltd: (January-May 2013)

-2013: Environment and Social Impact Assessment for Uganda National Chamber of Commerce Building with Pro Plan Partners Ltd: (March-May 2013)

-2013: Environment and Social Impact Assessment for Bugolobi Residential Apartments: Luzira Marina Ltd (May 2013: Ongoing)

-2013: Environment and Social Impact Assessment for : Feasibility studies for upgrading/rehabilitation of Kampala- Malaba Railway line-International Development Consultants (IDC) in association with JBG Gauff-Ministry of Works and Transport/Uganda Railways Corporation (May-September: 2013)

-2012: Preparation of Physical Development Plans for Selected Urban Centres in Northern Uganda (Serere, Asamuk, Usuk, Matany, Patongo, Pajule and Namokora Towns (2012)

-2012: Updating of environmental impact statements for Arua Municipality, Entebbe Municipal Council, Gulu Municipal Council, Masindi Town Council, Hoima Town Council, Busia Town Council and Tororo Municipal Council CDM sites- Nema (2012)

-2012: Environmental Supervision of Mbarara-Kikagati-Murongo Bridge Road Supervision with Prome Engineering Consultants. Project under Uganda National Roads Authority: 2012-ongoing.

-2012: Consultancy services for preparation of a Master Plan and Environmental Impact Assessment for Jinja Industrial and Business Park (2012-January 2013)

-2012: Environmental Impact Assessment for Kyagulanyi Coffee Factory-Namanve (2012)

-2011: Consultancy services for Environmental Impact Assessment for the proposed Kasagala and North Rwenzori Central Forest Reserve Activities (June-August 2011)

-2011: Environmental Supervision of Nyakahita-Kazo Road Supervision with Prome Engineering Consultants. Project under Uganda National Roads Authority: 2011-ongoing.

-2011: Consultancy Services for Engineering Supervision of Civil Works in Sub Counties in Northern Uganda (Bulisa, Masindi, Zombo, Kiryandongo, Nebbi, Maracha, Arua, Koboko, Yumbe, Moyo, Adjumani Lot 3 under Local Government Management Service Delivery Programme-Ministry of Local Government (February-August 2011). Environmental Component.

-2011: Environment and Social Impact Assessment for Teso region Fruit Factory: Ministry of Finance and Economic Planning in association with Uganda Development Corporation (April-June 2011)

-2011: Environment and Social Impact Assessment for : Feasibility studies for upgrading/rehabilitation of Kampala- Kasese Railway line with Technofin India in association with International Development Consultants-Ministry of Works and Transport/Uganda Railways Corporation (September: 2010-2011)

-2011: Environment and Social Impact Assessment for : Feasibility study, detailed engineering design, tender assistance and project management for upgrading roads to bituminous standards – lot A (Rwenkunye-Apac-lira-Kitgum-Musingo (350 kms) and Olwiyo-Gulu-Kitgum (167.1 kms) with AIC Italy, Soroti-Katakwi-Akisim-Moroto-Kotido-Lokitanyala and Nakapiripirit –Moroto with ACE in in association with Prome Consultants Ltd. (November : 2009-2011)

-2011: Environment and Social Impact Assessment for :Feasibility Study, Detailed Design and Construction Supervision of Katwe Kabatoro, Rukungiri and Lyantonde Town Water Supply Systems with M & E Associates (February: 2011)

-2011: Environmental Impact Assessment for Masindi-Kitara Medical Centre (Palmetto Medical Initiative Project)-Masindi diocese (2011)

-2011: Environmental Impact Assessment for Henvale Developments (Uganda) warehouses at Namanve Industrial and Business Park- Henvale Developments (Uganda) Ltd (2011)

-2011: Environmental Impact Assessment for Paper factory at Buyala, Mityana Road :MN Paper and Print Ltd (2011)

Environmental Impact Assessment for: Feasibility Study, Detailed Design and Construction Supervision of Butaleja-Busolwe, Tirinyi-Kibuku, Pallisa, Katovu and Lukaya Town Water Supply Systems with M & E Associate Consulting Engineers: Directorate of water Development (2010)

Environment and Social Impact Assessment for : Feasibility studies for upgrading/rehabilitation of Tororo- Packwach Railway line in association with Canarail-Canada: Ministry of Works and Transport/Uganda Railways Corporation (2010)

Environmental Impact Assessment for Seyani Warehouses and Batching Plant at Bukasa. Seyani Brothers (2010)

Environmental Impact Assessment for Henvale Developments Warehouses at Luzira, Bugolobi Villas and Warehouses-Mpanga lane (2010)

Consultancy Services for the preparation of Master Plan and Environmental Impact Assessment of Soroti Industrial and Business Park-Uganda Investment Authority (2010)

Environmental Impact Assessment of Lake Victoria Information Technology and Bio-tech Park (LAVIT) Jinja

The provision of Consultancy Services for the preparation of structure and detailed plans for urban local governments for : Moroto, Kotido, Abim, Amuria, Katakwi and Kapchorwa –World Bank Funded Project in association with Ministry of Lands, Housing and Urban Development (2007-2008)

Environmental Impact Assessment for: Feasibility studies and detailed designs of Mpigi-Kanoni, Maddu-Sembabule and Mukono-Kyetume-Katosi-Nyenga, Masaka-Bukakata and Sembabule Villa Maria with Sheladia in association with Prome Engineers-Ministry of Works and Transport/Uganda National Roads Authority (2010)

Feasibility studies and detailed designs of Arua-Oraba road with Comptran in association with Prome Consulatants. Ministry of Works and Transport/Uganda National Roads Authority (2009)

EIA for Waste Recycling Plant in Masindi Town and Hoima. Masindi and Hoima Local Governments. (2009-2010)

Environmental Impact Assessment Amuria Water and Sanitation Project. Directorate of Water Development (2009)

Environmental Impact Assessment for Kireka Luzira Power line with Mult-konsult: Ministry of Energy and Mineral Development (2010)

Environmental Impact Assessment for Katakwi-Moroto-Katikekile-Nakapiripirit-Sironko, Muhanga-Kyampene-Kisiizi-Rugyeyo, Kakumiro-Nkoko-Nalweyo-Hoima, Ibanda-Rutoma-Kamwenge-Rukunyu health centre, Kitgum-Palabek Kal-Kitgum-Madi Opei-Padibe-Kitgum-Nam Okora, Ruhoko-Nyarukika-Mpasho and Apac-Chegere-Alemi-Bala Electricity distribution lines: Ministry of Energy and Mineral Development/Rural Electrification Agency (2008)

Environmental Impact Assessment for EIA for construction and renovation of district land offices at selected sites in Uganda: Ministry of Lands, Housing and Urban Development (Funded by Private Sector Foundation), 2008.

Environmental Impact Assessment for EIA for construction and distribution of electricity from Mpanga Dam to National Grid and Surrounding Environs. Ministry of Energy and Mineral Development/Rural Electrification Agency (2008)

Environmental and Physical planning assessments (supervision) of Soroti-Dokolo road under J Barrow in conjunction with Prome: Ministry of Works and Transport /Uganda National Roads Authority (2008-2010)

Environmental and Physical planning assessments (supervision) of Lira-Dokolo road under J Barrow in conjunction with Prome: Ministry of Works and Transport /Uganda National Roads Authority (2008-2010).

Jinja-Bugiri road Environmental and Physical planning assessments (supervision) under BCEOM in association with Prome: Ministry of Works and Transport /Uganda National Roads Authority (2008-2010).

Environmental and Social Impact Statement Proposed Kampala Sanitation project (Sewage treatment plants in Nalukolongo, Lubigi, Kinawataka and Nakivubo): National Water and Sewerage Corporation. 2008

Environmental Impact Assessment for the feasibility study of Karamoja roads development project. With GAUFF and JBG: Ministry of Works and Transport, funded by European Union, 2007

Environmental Impact Assessment, EIA for Celtel masts (86 sites) with Plan systems. Zain Uganda. 2008-2011

Environmental Impact Assessment, EIA for MTN masts (70 sites) with Plan systems: MTN Uganda.2008-2011

Environmental Impact Assessment, EIA WARID masts (20 sites) with Plan systems: WARID Uganda.2008-2009

Environmental Impact Assessment, EIA for Governors Lodge, Kasese: Brovad Tours and Travel, 2008

Environmental Impact Assessment of Kampala Integrated Environment Management Project. With M&E. Kampala city council, 2008

Development of the National housing policy formulation of a 10 year strategic plan and drafting of a national housing Policy (Environment and Physical Planning Component) -Client Ministry of Lands, Housing and Urban Development. August 2007- 2008

Consultancy services for the Unification of Uganda Prison System (Land Use Component). Ministry of internal affairs (Uganda prison service)
November 2007-October 2008

Slum profiling and the national slum upgrading strategy. Ministry of Lands, Housing and Urban development (Physical Planning Component). 2007-2009

(Nakivubo, Butabika, Lubiigi and Nalukolongo) Kampala District.

Sanitation Strategy and Master Plan for Kampala City
Environmental social Impact Assessment Seven towns small water and sanitation project- Apac, Packwach,Nebbi, Kigumba, Mityana, Mpigi and Iganga)
UN-HABITAT -Lake Victoria Region Water and Sanitation Initiative (LVWATSAN)-Kyotera,Mutukula and Masaka

Uganda Investment Authority EIA for Bweyogerere industrial park. By GAUFF and URTC (Uganda Investment Authority 2008.)

EIA for 2 Industrial sites in Mbale and Mbarara. With plan systems. (Ministry of Trade and Industry through the Uganda Investment Authority, 2008)

EIA for Warid masts (20 sites).With Plan systems (Warid Uganda.2008)

EIA training (Juba EIA Training Course) for government of Southern Sudan (Ministry of Trade and Transport, Government of Southern Sudan.2008).

EIA for Governors Lodge, Kasese (Brovad Tours and Travel, 2008)

EIA for Celtel masts (30 sites) with Plan systems (Celtel Uganda-trading as Zain, 2008-2009)

Karamoja roads development project. (Environmental Assessments). With GAUFF and JBG (European Union, 2008)

EIA for construction and renovation of district land offices at selected sites in Uganda. (Ministry of Lands, Housing and Urban Development (Funded by Private Sector Foundation) 2008.

Proposed Bridal Centre, Centenary Park, Kampala (Nnalongo Estates Ltd. (2005)

Proposed tantalie mine in Kakamena, Ntungamo District (Marubeg Company Ltd. (2005)

Proposed Industrial Park, Kabuli, Makindye Division, Kampala (Gulf Stream Investments (U) Ltd. (2004)

Fish Filleting Plant for processing fish for export in Jinja (Gomba Fishing Industries Ltd. (GFIL), 1997)

Fish skin tanning factory in Jinja for processing fish skin from the filleting plant of GFIL (Uganda Fish Skin Tanning Ltd., 1997)

Salt Iodisation plant for iodisation of edible salt in Ntinda Industrial Area, Kampala (Crane Salt (U) Ltd., 1997.)

Plastics manufacturing plant based in Ntinda Industrial area, Kampala (Omega Plastics Ltd., 1997)

Proposed Soft Drinks Bottling plant (for Pepsi cola products) in Mbarara (Crown Bottlers Co. Ltd., Kampala. 1997)

The proposed laundry soap-making factory in Kigunga, Mukono District (Muddu Awulira Enterprises Ltd., Kampala., 1997)

Shell Kibuli Fuel Station (Shell Uganda Ltd., Kampala., 1997)

The proposed major earth works on Plot 2-28 Press House Road, Kampala (Mukwano Industries (U) Ltd., 1998)

The proposed warehouse and parking yard along Jinja Road (Mukabya Close), Kampala (Mukwano Industries (U) Ltd., 1998)

Toilet and laundry soap-making factory at Bugolobi, Kampala (Unilever Uganda Ltd., 1998).

The proposed oil mill for processing oil from oil seeds at Kawempe, Kampala (M.M. Holdings Ltd., Kampala, 1998).

Proposed Busumbu Phosphate and Namekara Vermiculite Mining projects in Mbale District (CANMIN Resources (U) Ltd., Gaba Road, Kampala, 1998)

The proposed cosmetics and toilet soap factory on Entebbe Road at Segguku (EZA Cosmetics & Marketing Ltd., 1998)

Environmental Scoping of the Namanve site for construction of Inland Port (Trans Africa Railways Corporation (TARC), Rosebank, South Africa, 1999).

Proposed 12 000 m2 warehouse for green leaf tobacco at Kayunga-Wakiso, Mpigi District (British American Tobacco (BAT) Uganda/Tibbett and Britten Kenya Ltd.; 1999)

Proposed Fuel Station on Port Bell, Luzira, Kampala (Caltex Oil (Uganda) Ltd., 1999).

Qualitative Assessment of Potential Environmental, Health and Safety Risks to BAT Uganda from Neighbouring Premises (British American Tobacco (BAT) Uganda; 1999).

Assessment of the Performance and Efficiency of Wastewater Treatment Plant(Mukwano Industries (U) Ltd., 1999)

Assessment of Industrial Relations, Welfare and Safety Services (Mukwano Group of Companies, 1999)

Proposed Water Treatment Plant and Effluent Treatment Plant(Gomba Fishing Industries, Jinja, 1999-2000)

Proposed Biomass cogeneration plant for electricity production(Sugar Corporation of Uganda Ltd. (SCOUL), Lugazi, 1999-2000)

Proposed Reconstruction of Kibuye Service Station along Kampala-Entebbe road (Caltex Oil (U) Ltd., 2000)

Proposed Reconstruction of Star Mengo Service Station(Caltex Oil (U) Ltd., 2000)

Proposed Reconstruction of Najjanankumbi Service Station along Kampala-Entebbe road(Caltex Oil (U) Ltd., 2000)

Proposed Kawempe Service Station along Bombo road(Caltex Oil (U) Ltd., 2000)

Proposed Inland Container Terminal on Fifth Street, Industrial Area, Kampala (in collaboration with COWI Uganda-Maersk Sealand,Denmark,2000

Proposed Kawempe Service Station along Bombo road(Caltex Oil (U) Ltd., 2000)

Environmental assessment of Uganda Meat Industries along Old Port Bell road, Kampala(Africa Project Development Facility (APDF) in Nairobi, 2000)

Proposed Mityana Service Station along Kampala-Mubende road(Caltex Oil (U) Ltd., 2000)

42.Proposed Fuel Station at Nalukolongo (Fuelex (Uganda) Ltd., 2000)

Proposed chemical warehouse, Sixth street, Industrial Area, Kampala(Desbro (U) Ltd., Kampala, 2000)

Proposed Jinja Road Service Station(Caltex Oil (U) Ltd., 2000)

Proposed Gayaza Road Service Station along Kampala-Gayaza road(Caltex Oil (U) Ltd., 2000)

Proposed Mbarara Service Station along Masaka-Mbarara road(Kobil Uganda Ltd., 2000)

Proposed Kasubi Service Station along Kampala-Hoima road(Kobil Uganda Ltd., 2001)

Proposed Inland Container Depot (ICD) in Bweyogerere along Kampala-Jinja road, Wakiso District (in collaboration with COWI Uganda- Ken freight (U) Ltd., 2001)

Proposed hotel extensions of Hotel Africana, Wampewo Avenue, Kampala (Hotel Africana (U) Ltd., 2001).

Assessment of Health, Safety and Environmental operations and activities of MTN Publicom (MTN Publicom (U) Ltd., 2001)

Proposed Masindi Service Station along Tongue Street(Kobil Uganda Ltd., 2001)

Proposed mining of tungsten (wolfram) in Nyamuliro, Muko, Kabale District (Krone (U) Ltd., 2001)

Proposed manufacture of industrial chemicals along Sixth Street, Industrial Area, Kampala(Syndachem (U) Ltd., 2001)

Proposed construction of warehouses in Arua and Hoima(BAT (U) Ltd., 2001)

Proposed Oil Mill, Lira Industrial Area, Lira Municipality(Mukwano Industries (U) Ltd., 2002)

Proposed Gold Mining Project in Kisita, Kasanda, Mubende District(Kisita Gold Mining Company, 2002)

Proposed Ostrich Farm in Balawoli, Kamuli District( Balawoli Ginnery Ltd., 2002)

Design and supervision of construction of waste water (effluent) treatment plant(Gomba Fishing Industries Ltd. (GFIL) complex, 1997) Gomba Fishing Industries Ltd. (GFIL) complex, 1997

Environmental Audit of toilet and laundry soap factory, edible oil refinery, cardboard factory and sodium silicate factory on Press House Road, Kampala(Mukwano Industries (U) Ltd., 1997-1998) Mukwano Industries (U) Ltd., 1997-1998

Design and supervision of construction of waste water treatment plant for fish processing plant(Greenfield’s (U) Ltd., Entebbe, 1997-1998) Greenfield’s (U) Ltd., Entebbe, 1997-1998

Environmental audit of plastics manufacturing factory on Port Bell Road, Kampala (A.K. Plastics Ltd., Mukwano Group of Companies, 1999). A.K. Plastics Ltd., Mukwano Group of Companies, 1999

Environmental audit of powder detergent (NOMI) and liquid detergent (SUPA) factory on Mukabya Close, Kinawataka, Kampala(A.K. Detergents Ltd., Mukwano Group of Companies, 1999) A.K. Detergents Ltd., Mukwano Group of Companies, 1999

Environmental assessment of the National Fuel Storage Tanks, Jinja (in collaboration with COWI Consulting Engineers and Planners A/S)( Dept. of Petroleum, Ministry of Energy and Mineral Development, Govt. of Uganda, 1999) Dept. of Petroleum, Ministry of Energy and Mineral Development, Govt. of Uganda, 1999

Environmental audit of Kabojja Junior School, Kololo, Kampala(Kabojja Secondary School Ltd., Kampala/APDF, 1999) Kabojja Secondary School Ltd., Kampala/APDF, 1999

Environmental audit of warehouse in Kinawataka wetland along Jinja road, Banda, Kampala(Meera Investments Ltd., Kampala, 1999) Meera Investments Ltd., Kampala, 1999.

Environmental Audit of Speke Resort, Munyonyo, Kampala (Speke Hotel (1996) Ltd, 1999-2000) Speke Hotel (1996) Ltd., 1999-2000